Changes between Version 35 and Version 36 of standards


Ignore:
Timestamp:
2016-02-01 17:56:49 (8 years ago)
Author:
dky
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • standards

    v35 v36  
    2323 
    2424 Pre-Alpha:: 
    25    The stage of development during which planning, but not actual production of assets or levels, is done. Production of assets or levels must not be done during this stage, until a development plan has been produced. 
     25   The stage of development during which planning, but not actual production of assets or levels, is done. Production of assets or levels (other than 3D characters and basic orange map layouts) must not be done during this stage, until a viable development plan has been produced. 
    2626 Alpha:: 
    2727   The stage of development during which production has started, and prototypes of levels and assets are in progress. Voice acting should not be done at this point in development, although placeholder voice acting assets may be done.